For NHS Organizations

Eliminate Your ADHD Waiting Lists in 12 Months

MHRA-certified, NHS DTAC-compliant platform delivering 200% capacity increase with existing resources. Save £7.6M annually while improving patient outcomes.

15
NHS Trusts Piloting
£7.6M
Annual Savings
200%
Capacity Increase

Trust Performance Dashboard

Example NHS Trust
Waiting List 2,847 → 987 -65%
Average Wait 156 weeks → 8 weeks -95%
Monthly Assessments 45 → 127 +182%
Patient Satisfaction 67% → 94% +27%

The NHS ADHD Crisis

Your trust faces the same challenges affecting every NHS organization

200,000+
Patients on ADHD waiting lists nationally
Creating unsustainable pressure on services
3-7 Years
Average waiting time for assessment
Leading to deteriorating patient outcomes
400%
Increase in ADHD referrals since 2019
Overwhelming existing capacity
£2.8B
Annual cost of unfilled mental health positions
While demand continues to soar

Impact on Your Trust

Rising Complaints

Increasing patient complaints and PALs contacts about waiting times

Legal Pressure

Potential litigation from assessment delays affecting patient outcomes

Cost Pressures

Agency staff costs and overtime creating budget strain

Staff Burnout

Clinician stress and retention issues from unsustainable workloads

NHS Service Transformation

Proven solution delivering immediate capacity gains and cost savings

Immediate Capacity Enhancement

Assessment Time Reduction: 60% faster completion
Patient Throughput: 200% increase with existing staff
Administrative Tasks: 75% automated elimination

Clinical Excellence & Standardization

Diagnostic Accuracy: 95% sensitivity, 92% specificity
Quality Assurance: Automated compliance monitoring
Professional Confidence: 85% improvement reported

Integrated Care Delivery

System Integration: HL7 FHIR R4 compliant
Multi-Agency Coordination: Seamless collaboration
Patient Journey: End-to-end management

Financial Impact Analysis

Quantified savings and return on investment for your trust

Calculate Your Trust's Savings

Projected Annual Savings

Efficiency Gains
£1.8M
Reduced Agency Costs
£1.2M
Prevented Crisis Costs
£3.1M
Total Annual Savings
£7.6M
Implementation Cost: £1.2M
ROI: 533%
Payback Period: 2.4 months

NHS Trust Success Stories

Real results from our pilot implementations

Manchester NHS Foundation Trust

Large Urban Trust

Challenge

4,200 patients on ADHD waiting list with 5.5-year average wait time

Results After 18 Months

300% Capacity Increase
6 months Average Wait Time
89% Patient Satisfaction
£3.2M Annual Savings
"My Assessment Space has transformed our ADHD service. We've eliminated our waiting list and our clinicians are more confident than ever."
Dr. Sarah Mitchell, Clinical Director

Birmingham Children's Hospital

Specialist Children's Trust

Challenge

Pediatric ADHD service overwhelmed with complex cases and family complaints

Results After 12 Months

250% Assessment Throughput
94% Diagnostic Accuracy
87% Staff Satisfaction
Zero Safety Incidents
"The platform has revolutionized our pediatric assessments. Families appreciate the clear communication and faster results."
Dr. James Patterson, Consultant Paediatrician

NHS Implementation Framework

Proven methodology for successful trust-wide deployment

1

Strategic Planning (Months 1-3)

Organizational Readiness

  • Current service capacity analysis
  • Workforce skill assessment
  • IT infrastructure evaluation
  • Stakeholder engagement planning

Pilot Site Selection

  • 2-3 pilot clinical areas identified
  • Staff selection and training
  • Quality assurance framework
  • Success metrics definition
2

Pilot Implementation (Months 4-9)

Limited Service Deployment

  • 50-100 patient pilot cohort
  • Clinical workflow optimization
  • Technical performance monitoring
  • Quality assurance validation

Results Validation

  • Clinical outcome measurement
  • Patient satisfaction evaluation
  • Professional feedback integration
  • Business case development
3

Trust-Wide Rollout (Months 10-18)

Service Transformation

  • Complete service migration
  • All clinical staff training
  • Full system integration
  • Quality monitoring implementation

Optimization & Enhancement

  • Advanced feature utilization
  • Continuous quality improvement
  • Best practice sharing
  • Regional collaboration

NHS Compliance & Integration

Full regulatory compliance and seamless NHS system integration

Regulatory Compliance

  • MHRA Software as Medical Device (SaMD) Class IIa
  • NHS Digital Technology Assessment Criteria (DTAC)
  • Data Security and Protection Toolkit
  • ISO 13485 Quality Management System
  • Clinical Safety Management (DCB0129/DCB0160)

Technical Integration

  • HL7 FHIR R4 interoperability standards
  • Lorenzo, Epic, Cerner system integration
  • N3/HSCN network connectivity
  • NHS Number validation and demographic matching
  • SNOMED CT terminology compliance

Data Protection

  • UK GDPR compliance with enhanced protections
  • Caldicott Principles strict adherence
  • Field-level encryption for all PHI
  • UK data sovereignty guaranteed
  • Comprehensive audit trails

Transform Your NHS ADHD Services

Join 15 NHS trusts already experiencing unprecedented capacity gains and cost savings. Schedule your executive briefing to see how we can eliminate your waiting lists.

MHRA Certified
NHS DTAC Approved
Zero Safety Incidents
533% ROI Proven